Chiba Monorail Sports Center Sta.
Work Information
| Completion | 1988年 |
|---|---|
| Owners | Chiba Prefecture |
| Location | Chiba Prefecture |
| Use | Station |
| Structure/Floors | S/1 |
| Total floor area | 708㎡ |
Prime contractor:Yachiyo Engineering Co., Ltd.
| Completion | 1988年 |
|---|---|
| Owners | Chiba Prefecture |
| Location | Chiba Prefecture |
| Use | Station |
| Structure/Floors | S/1 |
| Total floor area | 708㎡ |
Prime contractor:Yachiyo Engineering Co., Ltd.